SciELO - Scientific Electronic Library Online

 
 issue33The highlights of the ecuadorian labor market in seven stylized factsBankruptcy prediction by the Z2 Altman model around construction companies of residential buildings in Azuay province author indexsubject indexarticles search
Home Pagealphabetic serial listing  

Services on Demand

Journal

Article

Indicators

Related links

  • Have no similar articlesSimilars in SciELO

Share


Revista Economía y Política

On-line version ISSN 2477-9075

Abstract

BRISENO RAMIREZ, Hugo. The water supply proyect “El Zapotillo”: facts and perceptions. Revista Economía y Política [online]. 2021, n.33, pp.34-47.  Epub 13, 2021. ISSN 2477-9075.  https://doi.org/https://doi.org/10.25097/rep.n33.2021.02.

The aim of this paper is to describe the events that have arisen around the "El Zapotillo" dam and analyze them through the institutional analysis and development framework (IAD) of Elinor Ostrom, in order to examine the viability of the project. Press sources, technical reports, government documents and the Official Gazette of the Federation (DOF) were reviewed in order to identify the main events related to this project. As a result, elements were found that explain the reasons why the project has not materialized. The dam generates many doubts and uncertainties. A complicated legal situation makes its completion technically and politically unviable, at least for now.

Keywords : IAD; Temacapulín; water dam; water supply; Zapotillo..

        · abstract in Spanish     · text in Spanish     · Spanish ( pdf )